Plainview Elem School
Non-Transient non-community system in Douglas County, Missouri, serving 128 people from ground water. 3 rules violated in the past three years, 2 still unresolved. Owned by local government.
Quarterly compliance history
2023
2023
2024
2024
2024
2024
2025
2025
2025
2025
2026
2026
2026
Still in violation
EPA data updated Oct 7, 2026
Lead and Copper Rule
Monitoring and Reporting
1 violation, Dec 2025 to open
Lead and Copper Rule
Monitoring and Reporting1 violation, Dec 2025 to open
Monitoring and Reporting: 1 violation, open since Dec 2025. The system did not complete required monitoring, or did not report the results on time. This does not show that a contaminant was found.
What the rule requires: The 1991 LCR uses action levels rather than MCLs: if the 90th percentile of high-risk tap samples exceeds 15 ppb lead or 1.3 mg/L copper, the system must take escalating corrective actions. Violations typically indicate failure to maintain adequate corrosion control — the treatment that keeps lead from leaching out of pipes, solder, and fixtures.
About this rule
Public Notice Rule and Revised PN Rule
Other Violation
2 violations, Apr 2008 to open · Public Notification Rule
Public Notice Rule and Revised PN Rule
Other Violation2 violations, Apr 2008 to open · Public Notification Rule
Other Violation: 2 violations, open since Apr 2008. A requirement other than monitoring, reporting, or a contaminant limit, such as public notice or the annual water quality report.
Contaminant on the record: Public Notification Rule.
Also violated in the past three years
Jul to Sep 2023 to Jul to Sep 2026
Lead and Copper Rule Revisions
Reporting Violation
1 violation, Oct 2024 to Dec 2025
Lead and Copper Rule Revisions
Reporting Violation1 violation, Oct 2024 to Dec 2025
Reporting Violation: 1 violation, Oct 2024 to Dec 2025. The system did not report required information on time.
What the rule requires: The 2021 LCRR updated the 1991 LCR with mandatory lead service line inventories and replacement planning, a new 'trigger level' at 10 ppb requiring optimization, and strengthened public education. The 2024 Lead and Copper Rule Improvements (LCRI) further requires replacing all lead service lines within 10 years.
About this ruleAbout this data
Rules violated and the list above come from EPA's SDWIS violation records, one row per violation and contaminant, grouped by the rule each row belongs to. A violation counts when its non-compliance period ended on or after Jul 1, 2023, the start of the thirteen quarters ECHO's three-year figures cover, or is still open; it is unresolved when it was still open at EPA's data refresh on Oct 7, 2026. EPA's rule code 500, "Not Regulated", is left out, as in ECHO's counts. Each rule's violation count is EPA's, and one rule can carry several: a missed monitoring round for a group of contaminants is one violation per contaminant and period. Category names are EPA's violation categories.
ECHO's own summary count of rules violated agrees with this grouping for 98.8% of active systems nationally, and its count of rules being violated for 98.7%; where they differ, the figures here follow the rows listed.
Measured contaminant levels are not part of this record; each system publishes them in its annual Consumer Confidence Report.
Service area from EPA's Public Water System Service Area Boundaries dataset: location confidence HIGHER. The system's location is the centre of the service area EPA publishes for the system.
Source: the U.S. EPA's Enforcement and Compliance History Online system (ECHO), which publishes the federal Safe Drinking Water Information System. EPA's terms and values are shown as published. The Missouri records are from EPA's data refresh of Oct 7, 2026; EPA refreshes this data quarterly, and states report to EPA with a lag of three to six months, so the newest violations may not appear yet. Retrieved from ECHO on Oct 11, 2026.